Track electricity, water, gas, sewer and telecom connections from application to completion, with separate status and stages for each utility.
A typical project needs 6–8 different utility connections. Where is the electricity at? Was the water application filed? Did the gas approval come through? All on one screen — no surprises at occupancy sign-off.
Late utility connections delay the occupancy permit, often by one to three months, with rent, interest and penalties piling up each month. Tracking cuts that delay risk by about 70%.
Download for free and try it on site. No internet connection needed.